Pre Construction Process

Pre Construction Process

Your time, money, and energy can be saved by being aware of the pre-construction process. Participants in the pre-construction phase include the following.

  • Home Plan
  • Approval plan
  • Loan process(if required)
  • Temporary eb connection
  • Borewell
  • Shed

Every pre-construction step requires time.

Home Plan

  • As you select the specific building business to develop your residence. The first thing to think about will be the house plan.
  • Your home’s design should take into account your needs and the building budget.
  • When you plan, remember your needs for the house; that’s how your ideal home will come to pass. Make the required adjustments before you begin building.
  • The building company will deliver the house construction cost based on your requests and the confirmed plan. Once the plan and price meet your needs, move on to the next phase.

Note: The pre-construction and house construction costs supplied by the construction company are included in the budget for the house.

Approval plan

  • An approved plan must be produced when your house plan is created. Request a house approval plan from the building business. The approval plan drawing may be subject to different fees from construction companies.
  • The approval plan must be produced with the many house parts and specifics, such as the location of the rainwater tank and foundation specifications, among other things. The government has mandated that this approval plan be completed.
  • The locations of the plans and the size of the homes determine the government fees for plan approval. The fees are computed as a proportion of the cost of building a dwelling.
  • A registered engineer must approve and sign the approval plan.
  • The authorities must then sign the approval plan.

Loan process(if required)

  • If you must apply for a loan in order to build a house, be aware that the application procedure requires extra time.
  • The bank requires a number of documents in order to process loans. Ask for the necessary documentation at the bank where you would like to obtain a home loan.
  • Make sure you obtain the necessary paperwork and submit a loan application. in order for the loan to be approved as quickly as feasible.
  • You need to obtain the approval plan and estimate from the building company. to supply the bank with in order to handle loans.
  • The loan application process varies from bank to bank and may involve bank processing costs. Thus, make sure to check with it as well.
  • The loan application process can take a week to a month, or even longer.

Temporary EB connection

  • In order to obtain electricity, a temporary EB connection must be made.
  • Prepare the necessary paperwork and apply at the consent EB office for the temporary EB connection.
  • The land document (sale deed), property tax, computer patta, and approval plan are among the documents that can be needed in order to apply for a temporary EB connection. If there is already an EB connection, see the EB office about switching the connection (tariff) for building.
  • The temporary EB connection application fee levied by the government. The costs could vary based on the area.
  • This procedure could take up to one month to complete. Your application will receive a new meter box, and a connection will be made available.

Borewell

  • Before beginning the construction procedure, borewell must be completed. to supply water during building and then link to the water tank in the home.
  • Depending on where the property is located, the borewell’s diameter and depth vary. It may be necessary to drill a bore depth of 100 feet in certain locations and up to 350 feet in others.
  • After the boring procedure is complete, the borewell’s water must be extracted by fixing the motor.
  • The diameter and depth of the bore determine how much a borewell will cost. Aside from that, the motor, electrical wire, and pipes required for pumping water out of the borewell need to be purchased.
  • This process of borewell may take 1 to 3 days.

Shed

  • A shed is a type of storage built to hold the supplies and equipment needed for building.
  • When a temporary EB connection is available and the building of a house is to begin, the shed will be constructed.
  • After the boring procedure is complete, the borewell’s water must be extracted by fixing the motor.
  • The price of a shed might vary based on its size and the materials needed to construct it.
  • Building the shed may take 1 to 2 days.

Cost of house construction

  • Pre-construction and per-square-foot construction costs must be included to determine the total cost of building a house. We can determine the most suitable budget for building a house in this method.
  • When you plan for a change after settling on the budget, keep in mind that even a slight change in need can cause the budget to increase.
  • Let’s now examine pre-construction costs as well as cost per square foot.

Pre construction cost

The pre construction process is the things to be done and made ready before starting the house construction process.

Let’s see the process which is going to cost and added to the budget.

  • Approval plan cost
  • Temporary eb connection cost
  • Borewell cost
  • Shed cost

Make sure you calculate the cost of the mentioned pre construction processes and sum it up with the house construction cost.

Per square feet house construction cost

  • The cost of building a house is determined by cost per square foot.
  • The building companies only discuss the cost of building a house, which is calculated by multiplying the built-up area of the house by the cost per square foot. Therefore, you must figure out the pre-construction costs and include them to your budget.

Total cost of house construction

Pre-construction and house-building costs should be added to determine the overall cost or budget.

Total cost of house construction = Pre construction cost + House construction cost.